The City’s contractor, Hillside Drilling, has completed the retaining wall and has placed erosion control measures. They should be 100% complete with the slide repair by the end of the year.
12/07/18 – 2017 Storm Damage Repairs: 21 San Pablo
Posted on December 7, 2018