52-54 Fremont Project
Address: | 52-54 Fremont Road (double fronts onto Marquard) |
APN(s): | 012-043-011 and -012 |
Project No.(s): | ED18-066/LLA18-005/ED20-044/EX19-010 |
Applicant: | CKD Enterprises Inc PO Box 457 Cotati, CA 94931 Ckdluzak @ sonic.net |
Architect: | Millard Arterberry Arterberry Design 495 Gate 5 Rd. Sausalito, CA 94965 (415) 944-5480 millard@arterberry-design.com |
Project Planner: | David Hogan, Contract Planner dave.hogan@cityofsanrafael.org |
Project Status
Project withdrawn by applicant on August 18, 2022.
Project Description
Requests for a Lot Line Adjustment, Environmental and Design Review, and Exception (for reduction in the required front and side yards and amount of required natural state on a proposed lot fronting on Fremont Rd.). The project would reorient the property lines: one lot fronting on Fremont Rd and one lot fronting on Marquard Ave; includes the construction of a new single-family residence on Marquard Ave; and a remodel of an existing single-family residence plus addition of an accessory dwelling unit on the Fremont Rd lot.
Project Plans
Studies
-
- Cultural Resource Assessment
- Drainage Study
- Stormwater Control Plan
- Arborist Report- Redwood Tree Assessment- February 25, 2022
- Arborist Report - February 17, 2020
- Geotechnical Report 2019
- Peer Review of Geotechnical Report
- Response to Peer Review
- Northern Spotted Owl Assessment
- Memorandum on Using Coast Redwoods
California Environmental Quality Act Documents
Consistent with the California Environmental Quality Act (CEQA), the City has prepared a Revised Initial Study, Mitigated Negative Declaration and published a notice of intent to adopt a Mitigated Negative Declaration. The Revised Initial Study/Mitigated Negative Declaration is being made available for public review for a period of 20 days. The public review period commences on Saturday, August 14, 2021 and closes Friday, September 3, 2021. Written comments on the Revised Initial Study/ Mitigated Negative Declaration must be submitted by the close of the public review period.
Based upon the public comments on the Re-circulated Initial Study/Mitigated Negative Declaration, a Final Initial Study/Mitigated Negative Declaration and Response to Comments was prepared and are provided below:
- Final Initial Study/Mitigated Negative Declaration
- Response to Comments
- Re-circulated Initial Study/Mitigated Negative Declaration
- Revised Notice of Public Hearing
Previously released information.