949 Del Presidio Pavement Restoration – Tues 3/29 to Thurs 3/31

Posted on March 28, 2022


.

The Chevron team at 949 Del Presidio will be repaving the road along Manual T. Freitas and Del Presidio Blvd between 9 am and 2 pm on Tuesday 3/29 – Thursday 3/31.

At least one travel lane will be open in each direction at all times.  Emergency contact is Joseph Rowlette (909) 559 7216.

Close window