2023 Sewer Rehabilitation

Project Goals

To complete repair and replacement of deteriorated sewer main, sewer laterals, and manholes.

 

Budget

Construction $7,000,000.00

 

Overview

In 2019, the District televised and assessed approximately 11.5 miles of sewer main from 4-inch to 36-inch diameter and manholes throughout central San Rafael near the US Highway-101 and nearby adjacent streets, using the Pipe Assessment Certification Program (PACP) rating system. In 2023, the District entered a Professional Services Agreement with Schaaf & Wheeler to perform an analysis for the 2019 Pipeline Condition Assessment Report, compile a list of sewers recommended for replacement and prepare a set of bid documents.

The project consists of repairing and replacing segments of pipes between manholes, which total approximately 2.7 miles of sewer main. The pipe sizes are  6 and 8 inches in diameter. This project also includes the replacement of 215 laterals and rehabilitation of 76 manholes, located at more than 34 locations across San Rafael.

The second area of works expect to start in December 2024 (No work between December 20 to January 6) are below:

  1. Clyde Ave, Elm Street, and Belle Ave.  Map Link: Clyde-Elm-BelleAve_sewer_repairs
  2. Belle Ave, Elm Street, Linden Ln, and Grand Ave.  Map Link: Belle-Elm-Linden-Grand_
  3. sewer_repairs
  4. Hillcrest Drive: from 10 to 26 Hillcrest Drive. Map Link: HillcrestDrive_sewer_repairs
  5. Laurel Place:  from 100 to 114 Laurel Place. Map Link: LaurelPlace_sewer_repairs
  6. Glen Park Ave:  from intersection of Glen Park Ave and Hacienda Ct to 47 Glen Park Ave.  Map Link: GlenParkAve_sewer_repairs
  7. Villa Avenue 1 and Glen Park Avenue: from intersection with Lillian Ln to intersection with Myrtle Ave and intersection of Myrtle Ave and Glen Park Ave to back of 31 Corte Mesa Dr. Map Link: VillaAve1-GlenParkAve_sewer_repairs
  8. Villa Avenue 2:  from intersection with Myrtle Ave to near intersection with Glen Park Ave and two branch sewer lines in easement. Map Link: VillaAve2_sewer_repairs
  9. Roger Drive:  from intersection with GlenPark Ave to Cul-de-sac and between 11 and 15 Roger Drive to back of 14 Roger Drive.  Map Link: RogerDr_sewer_repairs

The first area of works are below:

  1. Prospect Drive from intersection with Lincoln to 25 Hammondale Ct and Hammondale Court. Map Link: ProspectDr-HammondaleCt_sewer_repairs
  2. Wilson Court. Map Link: Wilson Ct_sewer_repairs
  3. Prospect Drive from 235 to 257 Prospect Drive and back yard of 20 Vineyard Dr to 184 Coleman Dr.  Map Link: ProspectDr2_sewer_repairs
  4. East and South of intersection of Grand Avenue and Prospect Drive. Map Link: ProspectDr-GrandAve_sewer_repairs
  5. Brookdale Avenue. Map Link: BrookdaleAve_sewer_repairs

Timeline

Bidding July 2024
Construction  September 2024 - August 2025

 

Project Contact

San Rafael Sanitation District
SRSD@cityofsanrafael.org
415.454.4001

Close window