The Parks Department can be seen cutting the eastbound side of Freitas Pkwy. The Freitas Pkwy median, along with the medians along Las Gallinas and Las Colindas, constitute the ‘Big 3’ of summer pruning projects for the Parks Department.
Recently, the Parks Department was able to fit in a Spinnaker Point project on to their list of projects to be completed around the City. The rejuvenation of a small road median in the neighborhood helps to improve the aesthetic and ecological function(s) of the median. The residents of Hingham Cove were pleased with the … Continued
Trimming and pruning is beneficial to both trees and shrubs in more than one way. It helps to improve and maintain the overall health of vegetation by removing dead or dying branches and it also improves the appearance of plants and trees. Here we see members of the Parks Division working along the Las Colindas … Continued
Road markings help to reduce road accidents, controls traffic and obstructions to ensure safe driving and they also support safe pedestrian crossing. Here we see Streets Division crew member Jeremy Quintal utilizing the ride-a-long striping machine to install a new double yellow line(it was previously a single line with less visibility). This new addition will … Continued
Protected bike lanes help to reduce bike-related intersection accidents and help to keep bike riders safe. The bike lane located on Andersen Dr. southbound approaching the SMART tracks has been updated with buffer space, delineators, and additional “bike must exit” ground signage.
MMWD will be doing an asphalt plug at 1340 4th Street to improve the condition of the area prior to the bike race on 7/30/2022. This will result in the temporary closure of the westbound lane on Fourth Street between C Street and D Street. Work will begin on 7/27/2022 at approximately 7 am and … Continued
Wilhelm tree crews will be working in locations listed. They will be doing vegetation work along PG&E powerlines starting Monday 7/25/22 thru Friday 7/29/22. Public inquires can be addressed by the contractor: WILHELM LLC (707) 708-2932 2228 4TH ST 2126 5TH AVE 2232 5TH AVE 2500 5TH AVE 37.984789 -122.551658 5TH AVE 50 ACACIA AVE 18 … Continued
Summit Comm Inc. will be performing crane pick at 647 Francisco Blvd E. This is a one day road closure along Hoag Street beginning July 19, 2022. Please refer to map for the exact location of the closure. If needed, please forward email if necessary. If you have questions regarding the project please contact Jacob … Continued
The City of San Rafael in conjunction with Caltrans and the County of Marin CUPA removed an abandoned 1200-gallon underground storage tank from the right turn lane on the Highway 101 northbound Central San Rafael exit. This tank removal project was coordinated by the City of San Rafael as a part of the Caltrans Harbor … Continued
The City’s design consultant, CSW/Stuber-Stroeh Engineering Group Inc., has started engineering design for the Second Street & Fourth Street Intersection Improvement project. Kimley-Horn Inc., CSW’s subconsultant, will provide the traffic signal design for the project. The project aims to improve pedestrian and bicyclist crossing experience, reduce confusion between drivers navigating the intersection, and connect two … Continued