Apply to serve on a San Rafael Board, Commission or Committee!

 

Author: erika.spencer@cityofsanrafael.org

Road Closure – Brooks St – Saturday 2/12/2022

Kings Roofing will be closing Brooks St on Saturday 2/12 for approximately 5-6 hours to set up a crane for roofing work at the Kaiser office building. They have an encroachment permit, EP2201-073, and neighboring properties have been notified. Emergency contact is Mike Shultz (916) 956-4251.    

California Public Utilities Agency: 72-Hour Battery Back-up

In February 11, 2021 the Public Utilities Commission of the State of California made the decision to adopt a wireline provider resiliency strategy. As some residents may know the California Public Utilities Commission has ordered telecommunication companies to install a system to provide 72-hour battery back up to communication lines particularly to 9-1-1.  These facilities … Continued

AT&T: Tree work and Utility maintenance 2/7/2022 – 3/11/2022

AT&T will be conducting maintenance to their telecommunication lines, as well as tree work. Here are a list of roads that they will be working along with a map of the regions work will be happening. Work is scheduled for 2/7/2022 – 3/11/2022. Follow all traffic control signs and detours.   The street include: Bayview … Continued

Road Closure: Along C Street – At C Street at Bayview

PG&E will be performing overhead work and a pole replacement at 339 C St. The C Street will be  closed at C Street at Bayview. The road closure will beginning on February 16, 2022 and will only last for one (1) day. Please refer to detour map.

Wilhelm: Notice of Tree Work Monday 1/31/22 – Friday 02/04/22

Wilhelm tree crews will be working in locations listed. They will be doing vegetation work along PG&E powerlines starting Monday 1/31/22 thru Friday 2/04/22.   50 ALBERT PARK LN 910 ANDERSEN DR 935 ANDERSEN DR 37.960783 -122.512617 ANDERSEN DR 37.961217 -122.513335 ANDERSEN DR 0 ANDERSEN DR | NEAR 14 WOODLAND AVE 0 ANDERSEN DR | NEAR … Continued

Road Closure: Power pole replacement at 144 Bungalow Ave

Edison Power Contractors working on behalf of PG&E is scheduled to work on 01/29/2022. This work will require a road closure at 144 Bungalow Ave to replace a power pole. Please follow all traffic control detour and drive safely.  

Close window