Repairs to the Falkirk rear gates were made due to damage caused by Homeless people attempting to gain access to under deck area. The lattice was torn off and broken in several places. To help reinforce the gate we added 2’x4’s and plywood to strengthen the lower section. We removed the old material and garbage from below the … Continued
Terra Linda Pool and Community Center was having some issues with the pressure regulator for the water main. The unit developed a crack in the brass body and needed to be replaced. Out Facilities Team found an exact replacement locally and were able to make the repair same day
Coleman Childcare Center had issues with a sinking subfloor at the entrance. Due to deferred costs for larger projects, the flooring became costlier. As our team was removing the flooring, they found pests under the modular and pest control services were needed to remedy the issues. All damaged subfloor area was removed, and additional framing support added for new subfloor going in, linoleum was patched in. Pest control work … Continued
Parkside Preschool had plumbing issues with their sink. The damaged sink plumbing was leaking from multiple connections, the faucet was worn and damaged beyond repair. The water damage to the surrounding area was significant. Our facilities team had to replace the sink basin, faucet, water shutoff valve, and removed and cleaned up the damaged area. … Continued
Albert J. Boro Community Center received a wiring upgrade for future computer stations. Our team added several new 120v electrical receptacles on walls as needed. While doing this upgrade, they also ran new wiring for the computers to have online capabilities. The team installed cat6 cable throughout the lab which will be concealed in walls to create a clean look … Continued
The Pickleweed Childcare ADA ramp was in need of an upgrade. The ramp was slick and was creating a dangerous situation for the staff and children that use the facility. The team repainted the ramp with a non-slip paint and touched up the railings for a simple yet elegant solution to the problem!
Our facilities division provided the retaining wall behind City Hall with a much-needed paint job to keep our City Hall clean and well-maintained. It’s amazing what a pressure washer and a new coat of paint can do to brighten the area and enhance the public’s perception of the City
In December 2017, construction commenced for the Measure E-funded Public Safety Center (PSC), a new state-of-the-art facility for police headquarters and public safety services. On August 26, 2020, the City’s PSC achieved final completion. Due to the lengthy construction of the building and the increased demand from fire trucks and heavy vehicles stationed at the … Continued
In a project managed by Junior Engineer Shawn Graf, the City’s contractor Ghilotti Bros., Inc. and their electric subcontractor, Columbia Electric, are replacing the traffic signal poles in the intersection for the new configuration of the crosswalks.
We are very excited to announce that the Public Safety Center Project has achieved substantial completion. On July 1st, the last items required to operate the facility were substantially completed by the contractor, Alten Construction. The surveillance cameras and building security, as well as the heating and air conditioning systems were commissioned and finalized. The … Continued