By: JC Agcaoili, Assistant Engineer
Construction on the Freitas Parkway Sidewalk Replacement began on Monday, April 3rd, 2023. The City’s contractor, Sierra’s Concrete, has set up traffic control and pedestrian detour signs to ensure an accessible path of travel during construction. The goal of this project is to maximize budget by focusing on replacing the sections of sidewalk on Freitas Pkwy that are in most need of repair.