Whitewood Drive
November 16 – November 22: Resurfacing of Whitewood Drive
November 16 – November 22: Resurfacing of Whitewood Drive
October 31 – November 4: Micro-surfacing in the San Rafael Meadows neighborhood and Hingham and Plymouth Coves in Spinnaker Point. November 9 – November 15: Resurfacing in the Spinnaker Point neighborhood. Duxbury Cove (Spinnaker Point Dr to termination) Falmouth Cove (Catalina Blvd to termination) Gloucester Cove (Catalina Blvd to termination) Hingam Cove (Spinnaker Point Dr … Continued
October 24 – October 28: Curb ramp installation along Hetherton Street (nightwork). November 7 – November 9: Resurfacing. ACTIVE NIGHT CONSTRUCTION: 8:00pm-5:00am, November 7-9