On Monday, December 20 through Wednesday, December 23, there will be tree work on behalf of PG&E happening along powerlines at the locations indicated below. Temporary traffic controls will be in place based on the roads of each location using CA MUTCD temporary traffic control plans.
Please observe all traffic controls, directional signals, and traverse with caution.
- 1411 Lincoln Ave
- 22 San Pablo Ave
- 153 Prospect Dr
- 225 Elizabeth Wy
- 217 Bayview St
- 744 Penny Royal Ln
- 19 Gloria Dr
- 65 Fairway Dr
- 301 Highland Ave
- 1425 Grand Ave
- 667 Del Ganado Ave
- 619 Tamarack Dr
- 201 Belle Ave
- 14 Belle Ave
For questions or inquiries, please contact the contractor, Wilhelm LLC at (707)708-2932.