
MMWD’s subcontractor, WK McClellan will be performing nightwork near 30 N San Pedro Rd to restore the asphalt from a water leak repair. The night work is scheduled to be on Tuesday, 10/22 from approximately 7 P.M to 12 A.M.
Travel lanes are expected to remain open but shifted to accommodate the work area.
The site contact is Joel (415) 720-4746