The curb ramps on the northeast corner by the Shell gas station will be removed on May 2nd. They will be replaced with concrete and a barricade will be installed. The demolition is scheduled for May 2nd at night, and will require two lane closures on Second Street. The work will be done from 8:00pm to 6:00am.
Night Work: Second Street Curb Ramp Work Scheduled for May 2nd
Posted on May 1, 2023