Public Safety Center Resurfacing Project (CLOSED)

Posted on May 22, 2020


The project is located at 5th Avenue between A Street and the Mt. Tamalpais Cemetery, D Street between 5th Avenue and 4th Street, C Street between Mission Avenue and 4th Street, and Via Sessi from D Street to the end of the road, and is described as follows:

    • Pavement resurfacing
    • Slurry seal
    • Grind and overlay
    • Concrete flatwork
    • Bulbout
    • Retaining wall
    • Striping

Please click here for more information.