The Contractor is starting at the top of Fremont Road and will be working their way out of the neighborhood towards Marquard Avenue.
Due to the size and location of the spot repairs, the Contractor has the ability to move between multiple points in a standard workday and keeping the length of roadway closed allows for a simplified transition between repairs.