Sewer Lateral
Any sewer lateral work that includes construction in the right of way requires an encroachment permit. A sewer permit is needed from your sanitary sewer provider – San Rafael Sanitation District or Las Gallinas Sanitary District.
Any sewer lateral work that includes construction in the right of way requires an encroachment permit. A sewer permit is needed from your sanitary sewer provider – San Rafael Sanitation District or Las Gallinas Sanitary District.
Any driveway improvements that include work in the right of way requires an encroachment permit. There is the standard minor temporary encroachment permit fee associated with driveway work, see diagram below:
A Minor Temporary Encroachment Permit is required for all debris boxes and storage containers (i.e. portable on demand storage containers – PODS) placed on the street. Please note that an encroachment permit is not required if the debris box or storage container is placed on private property such as in a driveway and does not … Continued
Sidewalk, curb and gutter construction require a Minor Temporary Encroachment Permit, but there is no fee. All requirements of a Encroachment Permit apply except the fee. See diagram below for details on work associated with a no fee encroachment permit. A Minor Temporary Encroachment Permit is also required for the construction of installation of sidewalks, … Continued
No. The Safety Project will narrow vehicle lane widths on Third Street to maintain the existing left turn pocket from westbound Third Street onto southbound Lindaro Street, while still reducing the crossing distance for pedestrians.
Construction hours and temporary lane closures times are still be accessed. However both day and night work are anticipated.
The Safety Project will convert the driveway on Third Street to Exit Only southbound to help improve safety for pedestrians and remove the backup from cars turning right into a narrow driveway.
The city has created an interim plan to extend the bicycle facility.
The city has worked with residents along Second Street and the bicycle community to revise the original concept plan to utilize the entire right-of-way and reduce widths to provide parking. There will still be a net loss of 1-4 stalls between West Street and Shaver Street.
Start of work notifications must be submitted no less than 48 hours prior to start date. Inspections must be requested prior to the expiration of your permit. Failure to notify us prior to backfilling of trenches and/or restoration of the public right of way may result in re-excavation of the project. DISCLAIMER: Inspections will be … Continued