![.](https://storage.googleapis.com/proudcity/sanrafaelca/uploads/2022/01/144-bungalow.png)
Edison Power Contractors working on behalf of PG&E is scheduled to work on 01/29/2022. This work will require a road closure at 144 Bungalow Ave to replace a power pole. Please follow all traffic control detour and drive safely.
Posted on January 25, 2022
Edison Power Contractors working on behalf of PG&E is scheduled to work on 01/29/2022. This work will require a road closure at 144 Bungalow Ave to replace a power pole. Please follow all traffic control detour and drive safely.