The City Hall building will be closed to the general public on Fridays from June 6, 2025 through August 29, 2025. San Rafael Community Centers, Libraries, Al Boro Parking Services, and all Public Safety services will remain open and maintain normal Friday hours.

 

Search Results

Filters

6056 Results Found

The timing of the pedestrian crossing needs to be completed as part of the 95% design. The timing is determined based on lengths of crosswalks and an assumed typical walking speed of 3.5 feet per second per State guidelines.

In the currently proposed conceptual design, the merger would be restored. Some form of  traffic management would exist to protect pedestrians and cyclists making the north-south movement across the intersection.

The City is working with our Traffic Division to consider this request separately from the project.

The City is currently evaluating the feasibility of limiting truck sizes along Marquard Ave. and Fremont Road.

The infrastructure needed to physically tie the intersection to adjacent traffic lights along 2nd Street in not currently in place. The intersection would be timed via operational modifications. The existing intersection is not timed with adjacent traffic lights.

2024 Quarterly Average Daily Pedestrian and Counts as collected by existing MioVision cameras operated by the City of San Rafael are as follows: Q1 (January – March): Data not available, camera was not in operation Q2 (April – June): 120 pedestrians and 14 bicycles Q3 (July – September): 135 pedestrians and 24 bicycles Q4 (October...

As part of the preparation of the Local Roadway Safety Plan with the County of Marin, data was collected for the intersection. Between 2018 – 2023 the intersection has seen 15 total reported collisions; seven (7) of which resulted in injury. No reported collisions involved pedestrians. Two (2) bicycle collisions were reported: One (1) bicycle...

PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 4/14 – 4/18. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459.   LOT Street 1 EDWARD CT 1 HIGHLAND AVE 1 HUBBELL CT 100 Palm ave 103 HIGHLAND...

Date and time: 2025-04-16 06:00 pmLocation: Public Art Review Board - April 16, 2025 (Cancelled)Department: Public MeetingsAgendaSelect 'download' to view Cancellation NoticeDate and time: 2025-04-16 06:00 pmLocation: Public Art Review Board - April 16, 2025 (Cancelled)Department: Public MeetingsAgendaSelect 'download' to view Cancellation Notice

Date and time: 2025-04-15 06:00 pmLocation: Board of Library Trustees - April 15, 2025 (Special)Department: Public MeetingsAgendaSelect 'download' to view AgendaAgenda packetSelect 'download' to view Agenda PacketDate and time: 2025-04-15 06:00 pmLocation: Board of Library Trustees - April 15, 2025 (Special)Department: Public MeetingsAgendaSelect 'download' to view AgendaAgenda packetSelect 'download' to view Agenda PacketDate and time:...

Construction work continues on the City’s Pickleweed Park Enhancement project that began in September 2024. In preparation for the installation of the all-weather turf, the contractor has removed the existing grass field and is preparing the final grading. Most of the demolition work has been completed as well as minor concrete work and the installation...

At the April 2, 2025 Bicycle and Pedestrian Advisory Committee (BPAC), a presentation was given on the San Rafael Citywide Bicycle and Pedestrian Plan (CBPP) Update. The presentation included history of bicycle and pedestrian plans in the City, existing land use conditions for bicycles, pedestrians, and transit, and the outreach plan. Look at the presentation...

2025 Q1 - Employee: TBA Q1- Team: TBA 2024 Q4 Kate Hagemann, Sustainablility Division Team - DPW Shop & Maintenance Team Q3 Hector Carlos, Community & Economic Develipment (ALSO 2024 EMPLOYEE OF THE YEAR) Team - Police Patrol Team 2 (ALSO 2024 TEAM OF THE YEAR) Q2  Tyler Nord. Public Works   Team - SUPRISE TBD...

Close window