The City Hall building will be closed to the general public on Fridays from June 6, 2025 through August 29, 2025. San Rafael Community Centers, Libraries, Al Boro Parking Services, and all Public Safety services will remain open and maintain normal Friday hours.

 

Search Results

Filters

6053 Results Found

Address: 1201 Fifth Avenue Project No.: ED18-106;UP18-045 Applicant: 1201 Fifth Avenue, LLC 1101 Fifth Avenue #300 San Rafael, CA 94901 Construction Noise/ Site Disturbance Coordinator: Steve Monahan Project Planner: Ali Giudice, CDD Director (415) 485-3092 Alicia.giudice@cityofsanrafael.org Project Description The AC Marriott Hotel project was approved on April 23, 2019.  City approvals authorized demolition of an existing 10,600 square...

Generators and other Mechanical Equipment on Residential sites With concerns with global warming and the added pollution from fossil fuel use, please consider installing a solar system with a power wall or battery backup system before selecting a gas generator system.  Solar systems with battery backup will provide long term benefits with less emissions and...

If the document preview does not load here, please click "download" to the left.

If the document preview does not load here, please click "download" to the left.

If the document preview does not load here, please click "download" to the left.

If the document preview does not load here, please click "download" to the left.

If the document preview does not load here, please click "download" to the left.

If the document preview does not load here, please click "download" to the left.

If the document preview does not load here, please click "download" to the left.

If the document preview does not load here, please click "download" to the left.

If the document preview does not load here, please click "download" to the left.

If the document preview does not load here, please click "download" to the left.

Close window