Project Progress During the month of May, Alten Construction work progressed on the Fire Station Building, the Training Classroom and the Training Tower. The Tower erection began the first of May and neared the structure 50’ top out at the end of the period. The Classroom stucco system brown coat was applied and completed the...

Project Progress During the month of May, Alten Construction completed the slab on grade for the Office and Living Quarters areas. CMU installation for the Utility Rooms was completed and continued for the Apparatus Bay and Living Quarters. The installation of steel elements (ledgers and columns) continued for the Living Quarters. Installation of supports for...

To help with the annual pump station clean outs, a new vactor was purchased about 4 months ago for our maintenance crews. A vactor is a vacuum excavating equipment. It is used to collect trash and other debris that has accumulated in the pump station over the year. This week our crews worked diligently on...

On Saturday June 16th, commercial property owners and the City of San Rafael Street Division joined forces to perform a clean-up of the commercial area located on Simms St, Dodie, and Golden Gate Dr. Volunteers from Bellam Self-Storage and other business owners from the area, pulled weeds, swept streets, sidewalks and litter picked throughout all...

The intersection of Third Street and Hetherton Street is one of the most heavily congested in not only San Rafael but in the County of Marin. Additionally, the intersection is well traversed by pedestrians due to its central location to Downtown San Rafael, the Montecito Neighborhood, and the Transit Center. To improve pedestrian safety at...

Storm Drain Installation In preparation for on-site drainage work to be completed at the Public Safety Center, Public Works is managing a project to install a new storm drain system on D St (4th St to Via Sessi) as well as on Via Sessi. The project includes installation of six manholes and approximately 300 feet...

On Monday, June 18th Pubic Works staff completed inspections for the 350+ private properties that have signed up for the Sidewalk Repair Program. Inspectors reviewed all properties for sidewalk displacements, and indicated whether or not the sidewalk needed a full replacement or could be fixed with sidewalk shaving (a smooth grind of the sidewalk displacement...

At their regular Council meeting on Monday June 18th, City Council adopted the FY 2018-19 3-Year Capital Improvement Program. The CIP is a multi-year planning tool used to identify and implement the City’s capital needs over the upcoming 3-year period: FY 2018-19 through FY 2020-21. The CIP document summarizes the City’s planned capital and infrastructure...

SMART’s team has made great strides over the past several weeks in placing concrete, asphalt, and electrical equipment. The new traffic signal poles have been installed, and final testing of the traffic signal is scheduled for Tuesday, June 26th.  Temporary paving will be in place until we get approval from Caltrans for final resurfacing in...

4.12.030 - Vegetation management standards. A.  Any person owning, leasing, controlling, operating or maintaining a property containing a structure in or upon the city wildland-urban interface, and any person owning, leasing controlling, operating or maintaining a property that is adjacent to another property containing such a structure, shall at all times maintain a defensible space...

Sign up today for Alert Marin and protect your family in the event of an evacuation "ORDER" or "WARNING".   www.AlertMarin.org

PERMIT REQUIRED At All Times: SAN RAFAEL FIRE is NOT Issuing Burning Permits at this time. Last Updated June 20th, 2018

Learn what a resident is allowed to burn within San Rafael limits. Outdoor Fireplaces for Residents Current Regulation - Standard #11-0701 Introduction:  Some activities, operations and use require a Fire Permit, this standard focuses on activities that do not require a Fire Permit, but are regulated by the CFC and must be performed with caution not...

Before After   The new Victor Jones Park Playground is open to the public! There will be some minor utility work that will be completed by mid-July, however, the playground is now open for the community to use and enjoy. The Victor Jones Park Improvement project includes two new play structures, a new swing set,...