Search Results

Filters

8153 Results Found

The following classes begin in August. Check out our art classes, including ceramics, flower arranging, watercolor painting and art journaling. We're also offering virtual and in-person fitness classes, babysitter and lifeguard training, and Beginning Spanish. We look forward to seeing you! Click here to go to the San Rafael Recreation registration page to view all...

The Department of Public Works’ upcoming 20 Meyer Rd. Slide Repair project is now expected to start on Monday, 8/08.  Construction is projected to continue for at least two full weeks.  The project will stabilize the hillside with erosion control measures, which will include installing a new retaining wall and repairing the adjacent roadway. Residents...

The Southern Heights Bridge Replacement project, which was completed in January 2022, has won in 3 different categories of Engineering News-Record’s (ENR) 2022 Best Projects competition. The City’s project won the following: Best Highway/Bridge Project Excellence of Sustainability Award – Northern California, Excellence in Safety Award – Northern California, Award of Merit Almost 100 projects...

The Albert Park ADA Restroom project has been completed and includes a new prefabricated restroom, repaved walkway, new utility connections, and an ADA ramp. The new ADA accessible restroom building consists of four gender-neutral stalls located on the north side of the field. One of the stalls even includes a baby changing station. The brand-new...

Construction continues at two new fire stations Now that concrete placement of the elevator tower is complete at Fire Station 54, construction has continued into the living quarters. Wickman Development and Construction has the framework for the living quarters well underway with structural walls and interior walls complete. The second story of the building is...

Parks Lead Worker Matt Scales is pictured installing one of 50 new garbage cans on Fourth St. Upgrading 50 garbage cans was a collaborative effort years in the making.  Sustainability Coordinator Cory Bytof spearheaded the project, working with the Parks Department and Marin Sanitary to find a modern, sustainable garbage can.  These new, efficiently designed cans...

The Parks Department can be seen cutting the eastbound side of Freitas Pkwy.  The Freitas Pkwy median, along with the medians along Las Gallinas and Las Colindas, constitute the ‘Big 3’ of summer pruning projects for the Parks Department.

Recently, the Parks Department was able to fit in a Spinnaker Point project on to their list of projects to be completed around the City. The rejuvenation of a small road median in the neighborhood helps to improve the aesthetic and ecological function(s) of the median.  The residents of Hingham Cove were pleased with the...

Trimming and pruning is beneficial to both trees and shrubs in more than one way. It helps to improve and maintain the overall health of vegetation by removing dead or dying branches and it also improves the appearance of plants and trees. Here we see members of the Parks Division working along the Las Colindas...

Road markings help to reduce road accidents, controls traffic and obstructions to ensure safe driving and they also support safe pedestrian crossing.  Here we see Streets Division crew member Jeremy Quintal utilizing the ride-a-long striping machine to install a new double yellow line(it was previously a single line with less visibility). This new addition will...

Join us for Jumping Jacks at San Rafael Community Center Jumping Jacks is an hour-long class that consists of activities that encourage creative movement, balance and hand-eye coordination in  a high-energy, fun-filled atmosphere. The first half of each class is free play for parents/caretakers to enjoy interacting with their child/children and the last half hour...

Protected bike lanes help to reduce bike-related intersection accidents and help to keep bike riders safe.  The bike lane located on Andersen Dr. southbound approaching the SMART tracks has been updated with buffer space, delineators, and additional “bike must exit” ground signage.

Work continues on the implementation of the high priority Parking Box Program in the San Rafael neighborhoods. Parking boxes offer a clear indication of where it is safe to park and still allow safe resident emergency evacuation and access for emergency vehicles. The pilot project was completed in September of 2021 in the San Rafael/Lincoln...

Date and time: Date and time: 2022-08-03 06:00 pmLocation: Pickleweed Advisory Committee – August 3, 2022Department: Library & RecreationAgendaSelect 'download' to view agendaAgenda packetSelect 'download' to view agenda packetDate and time: 2022-08-03 07:00 pmLocation: Pickleweed Advisory Committee – August 3, 2022Department: Library & RecreationAgendaSelect 'download' to view agendaAgenda packetSelect 'download' to view agenda packetDate and...

Date and time: Date and time: 2022-08-02 06:00 pmLocation: Park & Recreation Commission - August 2, 2022Department: Library & RecreationAgendaSelect 'download' to view agendaAgenda packetSelect 'download' to view agenda packetDate and time: 2022-08-02 06:00 pmLocation: Park & Recreation Commission - August 2, 2022Department: Library & RecreationAgendaSelect 'download' to view agenda CorrespondenceAgenda packetSelect 'download' to view...

Spotlight Photo Snapshot en Español CAPTION: Construction crews removing an underground storage tank from the new right turn lane from Highway 101 northbound on to Second Street. PHOTO CREDIT: Shawn Graf, Assistant Engineer, Department of Public Works Last Quiz Question Congrats to Linda Aldrich for being the first to respond correctly to our mystery photo...

PG&E contractors will be temporarily closing a road to replace a power pole and overhead transformer by 108 Courtright Road. This is an approximate one day road closure along Courtright road beginning August 3, 2022 at 9 am. Please refer to map above for the exact location of the closure. Work is being performed under...

Wilhelm tree crews will be working in locations listed. They will be doing vegetation work along PG&E powerlines starting Monday 8/1/22 thru Friday 8/5/22. Public inquires can be addressed by the contractor: WILHELM LLC (707) 708-2932 50 ACACIA AVE 33 BAYO VISTA WAY 49 BAYO VISTA WAY 8 BRADCLIFF CT 8 BRADCLIFF CT 453 BRET...

Date and time: Date and time: 2022-08-03 06:00 pmLocation: Bicycle & Pedestrian Advisory Committee – August 3, 2022 (Cancelled)Department: Public WorksDate and time: 2022-08-03 06:00 pmLocation: Bicycle & Pedestrian Advisory Committee – August 3, 2022 (Cancelled)Department: Public WorksAgendaSelect 'download' to view cancellation noticeDate and time: 2022-08-03 06:00 pmLocation: Bicycle & Pedestrian Advisory Committee – August...

Close window