Search Results

Filters

2983 Results Found

[wp_e_signature_sad doc="1"]

[wp_e_signature]

Berghout, Lisa 95 Mount Tenaya Dr San Rafael, CA 94903 (415) 491-0747 berghout@I-inc.com http//.I-inc.dom Diesel Design 1852 Fourth St. San Rafael, CA 94901 (415) 482-8669 http//.dieseldesign.com Emaginate 3095-V Kerner Blvd San Rafael, CA 94901 (415) 454-9134 http//.emaginate.com I.inc design 95 Mount Tenaya Dr San Rafael, CA 94903 (415) 491-0747 berghout@I-inc.com http//.I-inc.com Lucey, Jack 84 Crestwood...

What is a Junior Second Unit? Junior Second Unit means an additional, independent living unit which is created through the conversion of an existing bedroom within an existing single-family residential dwelling as part of the single-family use, and subject to defined standards in Section 14.16.286 of the Zoning Code. A Junior Second Unit may be...

Submit your claim electronically or download a PDF and submit it either in person, by mail, or fax to the City Clerk’s Office. As with all claims, you should provide any information that you believe will support your claim (i.e., estimates, photographs and diagrams). The outside adjuster will move quickly to resolve your claim. As soon as...

As we continue to find new ways for the City, the County of Marin, our services providers, and our community members to come together to address homelessness (check out the Marin Voice article this week highlighting the positive impacts of collaboration), I think it is important to remember that at the end of the day,...

You're definitely going to want to contact us to find out if you need a sign permit for any new commercial business signs intended for public view. For your application you’ll need to provide: Photographs of all existing signs on the building. An inventory of all existing signs on the site. This inventory should include location...

Yes, it is the expectation of the City is that all program applicants will follow through with the identified sidewalk repairs in the pre-construction inspection survey. In the pre-construction inspection conducted by the City, the City will identify all needed sidewalk repair and replacement, tree root shaving/removal, and required sidewalk/curb-gutter replacement. This is the (a) city approved work. Once the property owner receives their pre-inspection...

Business license renewal notices have been distributed to all businesses with active licenses in San Rafael. Each license renewal is due by February 15 and the City accepts cash, checks, money orders, and most major credit cards. Licenses may be renewed online via credit card or eCheck at www.cityofsanrafael.org/businesslicenses.  For questions about business licenses, please call...

Business license renewal notices have been distributed to all businesses with active licenses in San Rafael. Each license renewal is due by February 15 and the City accepts cash, checks, money orders, and most major credit cards. Licenses may be renewed online via credit card or eCheck at www.cityofsanrafael.org/businesslicenses.  For questions about business licenses, please call...

The City held a study session on November 20 and has held public hearings on December 4, December 18 and January 16 to receive public input.  Now that the City Council has decided to transition to district-based elections, the City Council will hold multiple meetings over a period of not more than 90 days in...

Storm Drain Installation In preparation for on-site drainage work to be completed at the Public Safety Center, Public Works is managing a project to install a new storm drain system on D St (4th St to Via Sessi) as well as on Via Sessi. The project includes installation of six manholes and approximately 300 feet...

Weekend Striping! On Sunday, September 23, the Department of Public Works will be center striping, or re-painting the center road markings, through Downtown San Rafael. Staff will be using a water-based paint to do the job. It’s environmentally responsible, paint remains flexible and withstands movement, it’s fast drying (10-15 minutes!), and it comes in many...

[wp_e_signature_sad doc="9"]

The MTC Board of Commissioners voted unanimously to program $4.025 million to the Francisco Boulevard East / Grand Avenue Bridge Pedestrian and Bicycle Connectivity project submitted by the City of San Rafael with support from the Transportation Authority of Marin. The City of San Rafael’s project was ranked No. 1 of the 14 projects in the Bay...

Work Completed In Past Four Weeks The concrete pile foundations for the new bridge on the east side of Las Gallinas (see photos above). The foundations are 30’ deep and take about one day each to construct.  The Contractor removed the old ‘pork-chop’ island on the southeast corner (i.e., Safeway corner) where the traffic signal...

The Paint & Sign crews have turned what previously was a 2-way stop at First & E street into a 4-way stop.

Close window