Updates to City Hall Hours on Fridays in July and August 

 

Search Results

Filters

2959 Results Found

Matched in attachment: "... . Additionally, the Downtown San Rafael SMART Station has generated an increase in pedestrian traffic ... version. Final plans shall be 22”x34” PDFs, be signed by the engineer in responsible charge licensed ... by the engineer in responsible charge licensed in the State of California, and ready for reproduction. 6 ... charged to the project on a monthly basis. The prime Consultant and all subconsultants shall ... prevailing wage rates and be consistent with publicly advertised rates charged to all clients ..."

Matched in attachment: "... -on-foot pay stations shall have a modular design. Components shall be able to be quickly changed ... . Multi-space pay stations must accept Visa, MasterCard, Discover, and AmEx credit cards and debit cards ... FOR PROPOSAL FOR MULTI-SPACE PAY STATION / PAY-ON-FOOT UNIT & MANAGEMENT SYSTEM RFP ... , pay by license, and/or pay & display) parking meter (Pay Station / Pay-On-Foot) for several ... of their off-street parking facilities. “Multi-Space pay station” parking meters shall refer to devices ..."

Matched in attachment: "... : • Climate Change REPORT TO PLANNING COMMISSION - Case No: ZC05-01, UP05-08, ED05-15 ... No: ZC05-01, UP05-08, ED05-15 Page 25 of 28 Climate Change (Chapter 15, DEIR pages 15-1 through ... on the north and south side of the building, and empty into the creek via an existing pump-station ... capacity of the site, and the capacity of the pump station to eject 500,000 gallons per hour/18.5 cubic ... Environmental Impact Report (FEIR) published for a Zone Change, Master Use Permit and Environmental ..."

Matched in attachment: "... the station delights everyone with its ever-changing parade of wildlife. The whole area feels open ... are requested to refrain from wearing scented products. Agenda Civic Center Station Area Plan ... . Station Plan Administrative Version Presentation 7:40  Introduction  Consultant Presentation ... • Civic Center Station Area Plan Advisory Committee Draft Notes for 02/08 Meeting - 1 ... - Civic Center Station Area Plan Advisory Committee Meeting Notes: Wednesday, February 8, 2012; 7:00 – 9 ..."

"... new certificates every time a license is renewed, unless there is a significant change such as a new ..."

To save paper, postage, and staff time, we are no longer printing new certificates every time a license is renewed, unless there is a significant change such as a new business name or address. You can view expiration dates in the online business registry.

Matched in attachment: "... C-street Parking Garage Parking Admin Office Boyd House Falkirk Fire Station 519, 53, 54 ... . Libraries WAN connectivity bandwidth is 1Gbps. New Fire Station 52, Station 57 will have dual broadband ... 20Mbps fiber from ATT and Comcast. Both stations connect back to City Hall via point-to-point IPSec ... in diagnosing video viewing stations using basic utility such as ping.exe. Network path to Golden Gate ... is the standard markup that you charge on the following types of technology units: a. Desktops b ..."

Matched in attachment: "... : Audiencia pública: El 2 de abril y el 16 de abril de 2018, a las 7:00 p.m., en la Sala del Consejo ... Municipal, ubicada en 1400 Fifth Avenue, el Consejo Municipal de la Ciudad de San Rafael conducirá ... secuencia de elecciones en tales distritos. En la audiencia pública el 2 de abril, se invita al ... miembro para elecciones por distrito, y borradores de mapas cuando estén disponibles, en el sitio ... web de la Ciudad en https://www.cityofsanrafael.org/district-elections. En el caso de que sean ..."

Matched in attachment: "... ; zoning changes will impact the Civic Center Station Area Plan Advisory Committee Draft Notes ... Civic Center Station Area Plan Advisory Committee Draft Notes for 07/25 Meeting - 1 ... - Civic Center Station Area Plan Advisory Committee Meeting Notes: Wednesday, July 25, 2012; 7:00 – 8 ... :30 pm Guide Dogs for the Blind, 350 Los Ranchitos Rd. Attendance Civic Center Station Area ... charged parking in order to encourage county employees to use the train and not place any further ..."

"... the month of January, Alten Construction continued to work on the Fire Station Building; the Classroom ... Building and the retaining wall/ bio-retention on the North-East side of the site. At the Fire Station ..."

Project Update: During the month of January, Alten Construction continued to work on the Fire Station Building; the Classroom Building and the retaining wall/ bio-retention on the North-East side of the site. At the Fire Station Building, contractor continued with installation of Scaffolding, wood framing at the bay room and the CMU Block. The CMU...

"... the month of January, Alten Construction continued to work on the Fire Station Building; the Classroom ... Building and the retaining wall/ bio-retention on the North-East side of the site. At the Fire Station ..."

Project Update: During the month of January, Alten Construction continued to work on the Fire Station Building; the Classroom Building and the retaining wall/ bio-retention on the North-East side of the site. At the Fire Station Building, contractor continued with installation of Scaffolding, wood framing at the bay room and the CMU Block. The CMU...

"... and foundation rebar for the Fire Station Building. Prior to installing the Helical Anchors the contractor ... checked by the sub-contractor. The Classroom concrete slab and the Helical Anchors at the Fire Station ..."

Project Progress During the month of September, Alten construction prepared the Classroom Building for a concrete slab placement. During the preparation, the contractor placed the slab rock, 15 mil vapor barrier, slab rebar, still anchor bolt plates and all utility stubs. After the pour the contractor cured the slab by flooding it with 2 to...

"... . SMART’s San Rafael Station will also be closed ... SMART’s Marin Civic Center Station, the San Rafael Transit Center, and the Larkspur Ferry Terminal ..."

Due to construction of the SMART Larkspur Rail extension, there will be two weekend street closures in June. Both closures begin at 8:00 p.m. on Friday and end by 4:00 a.m. on Monday. Businesses will remain open during construction. Second Street will be closed on Saturday, June 1 and Sunday, June 2, and Third Street...

"... , transparency, and better government Building capacity across City teams empowers positive change ..."

Government should be designed with and for people Empathy for all users leads to equitable outcomes Data and information should be used to create trust, transparency, and better government Building capacity across City teams empowers positive change Technology should be secure, accessible, and make life easier

"... The California Public Records Act provides that a fee may be charged to cover the direct ... will be charged for photocopies. This fee may be waived at the City’s sole discretion for requests totaling ... to the terms of the California Public Records Act (Government Code §6250 et seq.) and  include any writing ..."

The following information is provided as background on how to request public records from the City of San Rafael.  The California State Legislature adopted the Public Records Act in 1968. It is designed to give the public access to information in the possession of public agencies. The Act also provides that public records shall be...

"... their third Spanish Community Police Academy (CPA). The CPA is offered free of charge, and is a hands ... adjustments and mid-year personnel changes. Read the staff report ... . For the Lane Shift on Second Street the posted speed limit is 25 mph. Drivers should be aware of changed ... the formation and boundary changes of cities and special districts. In addition, the Commission ... en Español ..."

Snapshot en Español   Spotlight Photo San Rafael Sunset Photo Credit: Bernadette Sullivan, City Manager’s Office Last Quiz Question Congrats to Chase Sambell for being the first to answer our latest Snapshot Quiz. San Rafael is home to sixteen local Landmarks! Check out the full list here. Congrats Chase, and thanks for reading Snapshot. Scroll...

"... Michael Rieser and Anthoney Heaven assisted with the installation of new acoustic panels at Fire Station ..."

To help firefighters hear dispatchers better and with less distortion, Facilities team members Michael Rieser and Anthoney Heaven assisted with the installation of new acoustic panels at Fire Station 57. The installation of these panels will help reduce the echo noise in the apparatus bay area

"... The curb ramps on the northeast corner by the Shell gas station  will be removed on May 2nd ..."

The curb ramps on the northeast corner by the Shell gas station  will be removed on May 2nd.  They will be replaced with concrete and a barricade will be installed.  The demolition is scheduled for May 2nd at night, and will require two lane closures on Second Street.  The work will be done from 8:00pm to...

Matched in attachment: "... . The City may also support residents requesting the $2.20-per-month charge per parcel ... cameras with heat detection and micro- weather stations. Install two additional cameras to cover ... and micro-weather stations to monitor fire and fire weather conditions. Only a limited number ... clearing the hazardous fuels charged to the them. Rationale Many privately owned, unimproved ... with climate change, the City of San Rafael has been actively evaluating methods to further reduce our ..."

Draft Wildfire Prevention and Protection Action Plan (as presented at the January 22, 2019 City Council meeting)

"... station ... ). The project proposes to demolish the existing commercial building and gas station ... No.:  ED ..."

Northgate Walk1005 & 1010 Northgate Dr. Address: 1005, 1010, 1020 and 1025 Northgate Drive Project No.:  ED16-038, UP16-018, S16-001, LLA16-003,  PTA 16-001 Applicant: Peter Stackpole, LCA Architects 590 Ygnacio Valley Rd, Suite 310 Walnut Creek, CA 94596 (925) 944-1626 Project Planner: Jeff Ballantine (415) 485-3094 jeff.ballantine@cityofsanrafael.org Project Description The City received an application proposing to redevelop...

Matched in attachment: "... iously comp ends at the S flect that. Is  s still conside station.    Colin, Councilme ADDE ...  of the e lighting in t Center Statio ines. The “Pr tive still bein around at th mblin, Councilme    1 ... Merrydale  PR M SHALL BE I LL CONDITIO eflect  chang n received by dline date fo evaluating ...  THIS ADD IS ADDENDU additions  to or this projec scope of wo n calls for a t ernative” dr ed ...      By:   S Ju       n 5  states the C ed to date. W ion period t e: The City w ard of contra hawn Graf ..."

Merrydale North Promenade Addendum No. 1

Close window