There will be night work occurring at Second Street at Tamalpais Ave/Francisco Blvd W on 12/16 – 12/17 during the hours of 8 PM – 4 AM. The contractor is working on behalf of SMART. SMART is performing riparian enhancement project along the San Rafael creek area. Their contractor Hanford ARC will be doing the site preparation to get access for dump truck and small excavator.
SMART: Riparian Enhancement Project – Night work from 12/20 to 12/21
Posted on December 14, 2021