Spinnaker Point Post Construction Project

About

Project Goals 

  • Construction of a bioretention area. 
  • Complete existing sidewalk connection. 

Overview 

The Spinnaker Point Post Construction Project will introduce a bioretention area and complete a portion of sidewalk connection along Canal Street. The bioretention area will utilize specific soil and landscaping to function as filtration devices for incoming stormwater.  

Budget 

Construction: $160,000 

 

Project contact 

Andrew Powell | Junior Engineer
andrewp@cityofsanrafael.org
415.458.5006 