Project Description: These two projects include installation of hot mix asphalt and/or micro-surfacing treatments at various locations throughout the City. This project also includes installation of American’s With Disability Act (ADA) compliant curb ramps, curb, gutter, and sidewalk. Curb ramps must be installed prior to resurfacing of streets per federal law.

Project Status: This project is in the design phase. Below is a list of roads that will potentially be a part of this project. This list is subject to change. Construction is anticipated to begin late summer 2017.

Street Name From To
Bret Harte Road City Limit Altura Way
Altura Way City Limit Bret Harte Road
Bret Harte Lane Bret Harte Road Bret Harte Road
M’Liss Lane Bret Harte Road End
Broadview Drive Jewell Street End
Pacheco Street Lincoln Avenue Stevens Place
Hibiscus Way Holly Drive Hickory Lane
Pine Lane Las Raposas Rd Penny Royal Lane
Penny Royal Lane Pine Lane Las Ovejas Avenue
Knight Drive Alderwood Way End
Bay Ct Bay Wy End
Bay Wy Pt San Pedro Rd End
Marian Court Kerner Blvd End
Makin Grade Upper Toyon Dr End
Tamalpais Avenue Mission Avenue Fourth Street
Vivian Place Francisco Blvd East Belevedre Street
Hoag Avenue Francisco Blvd East Canal Street
Allen Court Forbes Av End
Hubbell Court Jewell St End
Edward Court Palm Av End
Elkin Court Santa Margarita Dr End
Thornwood Terrace Tamarack Dr Tarragon Dr
Hyacinth Way Holly Dr Hickory Ln
Sandalwood Court Manuel T Freitas Pkwy End
Bellevue Avenue Pt San Pedro Rd End