Project Description: These two projects include installation of hot mix asphalt and/or micro-surfacing treatments at various locations throughout the City. This project also includes installation of American’s With Disability Act (ADA) compliant curb ramps, curb, gutter, and sidewalk. Curb ramps must be installed prior to resurfacing of streets per federal law.
Project Status: Below is a list of roads that will potentially be a part of this project. This list is subject to change. Construction has begun and is anticipated to be completed by end of summer 2018.
Street Name | From | To |
Bret Harte Road | City Limit | Altura Way |
Altura Way | City Limit | Bret Harte Road |
Bret Harte Lane | Bret Harte Road | Bret Harte Road |
M’Liss Lane | Bret Harte Road | End |
Pacheco Street | Lincoln Avenue | Stevens Place |
Stevens Place | Pacheco Street | End |
Hibiscus Way | Holly Drive | Hickory Lane |
Pine Lane | Las Raposas Rd | Penny Royal Lane |
Penny Royal Lane | Pine Lane | Las Ovejas Avenue |
Knight Drive | Alderwood Way | End |
Bay Ct | Bay Wy | End |
Bay Wy | Pt San Pedro Rd | End |
Marian Court | Kerner Blvd | End |
Makin Grade | Upper Toyon Dr | End |
Vivian Place | Francisco Blvd East | Belevedre Street |
Allen Court | Forbes Av | End |
Hubbell Court | Jewell St | End |
Edward Court | Palm Av | End |
Elkin Court | Santa Margarita Dr | End |
Thornwood Terrace | Tamarack Dr | Tarragon Dr |
Hyacinth Way | Holly Dr | Hickory Ln |
Sandalwood Court | Manuel T Freitas Pkwy | End |
Maywood Way | One Way Loop | One Way Loop |
Bellevue Avenue | Pt San Pedro Rd | End |