City Hall and other offices will be closed to the public from December 23 to January 3, but appointments are available upon request. Public safety and emergency services remain available 24/7.  

Street Resurfacing & Curb Ramps 2017-2018

Posted on February 16, 2018


Project Description: These two projects include installation of hot mix asphalt and/or micro-surfacing treatments at various locations throughout the City. This project also includes installation of American’s With Disability Act (ADA) compliant curb ramps, curb, gutter, and sidewalk. Curb ramps must be installed prior to resurfacing of streets per federal law.

Project Status: Below is a list of roads that will potentially be a part of this project. This list is subject to change. Construction has begun and is anticipated to be completed by end of summer 2018.

Street Name From To
Bret Harte Road City Limit Altura Way
Altura Way City Limit Bret Harte Road
Bret Harte Lane Bret Harte Road Bret Harte Road
M’Liss Lane Bret Harte Road End
Pacheco Street Lincoln Avenue Stevens Place
Stevens Place Pacheco Street End
Hibiscus Way Holly Drive Hickory Lane
Pine Lane Las Raposas Rd Penny Royal Lane
Penny Royal Lane Pine Lane Las Ovejas Avenue
Knight Drive Alderwood Way End
Bay Ct Bay Wy End
Bay Wy Pt San Pedro Rd End
Marian Court Kerner Blvd End
Makin Grade Upper Toyon Dr End
Vivian Place Francisco Blvd East Belevedre Street
Allen Court Forbes Av End
Hubbell Court Jewell St End
Edward Court Palm Av End
Elkin Court Santa Margarita Dr End
Thornwood Terrace Tamarack Dr Tarragon Dr
Hyacinth Way Holly Dr Hickory Ln
Sandalwood Court Manuel T Freitas Pkwy End
Maywood Way One Way Loop One Way Loop
Bellevue Avenue Pt San Pedro Rd End
Close window