Third Street Improvement Project – 03/24/2023 weekly update

Posted on March 24, 2023


The City of San Rafael will be sending out weekly project updates with construction updates, traffic

 closure updates, and other relevant information for this project. To receive these updates, please sign up using the form at the left-hand side of the project website.

  NIGHT WORK: APRIL 3rd

Crews will be replacing the storm sewer pipe on Third Street and B Street. This work will be performed starting Monday night at 7:00pm and concluding, Tuesday morning 6:00am

THIS WEEK (March 20 – March 24):

  • Construction crews replaced the sanitary sewer lateral on Third Street from Lootens Place to A Street.
  • Crews replaced the sanitary sewer lateral on Third Street from Cijos Street to Lincoln Avenue.
  • Crews removed concrete for curb ramps at the north east corner of Third Street and A Street, and at Third Street and B Street.
  • Crews replaced a storm drain at the intersections of Third Street and B Street, and Third Street and A Street.
  • Crews replaced sidewalk sections on Ida Street and G Street.
  • Crews removed asphalt pavement for the construction of new median islands on Second Street from Marquard Avenue to G Street.
  • Crews repaved Second Street, between Marquard Avenue and G Street, to eliminate potholes.
  • Crews replaced traffic signal poles at the intersection of Second Street and Fourth Street.
  • Crews shifted traffic lanes to the south on Second Street between Marquard Avenue and Shaver Street.

NEXT WEEK (March 27 – March 31):

  • Crews will shift traffic lanes northward on Third Street from C Street to E Street.
  • Crews will place concrete for a curb ramp at the north east corner of Third Street and A Street and B Street. This work will require a curb lane closure and no parking adjacent to the intersections.
  • Crews will start to remove concrete for curb ramp at the south east corner of Third Street and E Street, D Street, and C Street. This work will require a curb lane closure and no parking adjacent to the intersections.
  • Crews will replace storm drains at Third Street and A Street, and Third and B Street. This work will require a curb lane closure and no parking adjacent to the intersections.
  • Crews will continue to construct the new median islands on Second Street from West Street to G Street. The work will require a lane closure and traffic lane shift.
  • Crews will replace the sanitary sewer lateral main on Third Street between A Street and Lootens Place. This work will require a lane closure on Third Street.
  • Crews will replace the sanitary sewer lateral main on Third Street between Lincoln Avenue and Cijos Street. This work will require a lane closure on Third Street.

IMPACTS:

  • Beginning April 24th, 2023, the crews will be replacing the sanitary sewer pipe on Third Street between Lincoln Avenue and Irwin Street. This work will be performed at night (7:00pm to 6:00am)
  • The stairway from Second Street to Jessup Street (south of Ida Street) is closed.
  • For the Lane Shift on Second Street, the posted speed limit is 25 mph. Drivers should be aware of changed conditions and be alert.
  • Traffic Controls (temporary signs, message boards, traffic cones, delineators and detour signs) will be put in place to direct motorists through the work area.
  • Curb parking spaces will be marked “No Parking.”

The hours of work will be 6:00am – 6:00pm and lane closures 6:00am – 3:00pm on Third Street and Second Street westbound, and 9:00am – 6:00pm on Second Street eastbound.