THIS WEEK (August 29 – September 2):

  • Nightwork: Crews completed installing new water main on Third Street.
  • Installed fiber optic cable and conduit by horizontal directional drilling at Third Street from G Street to Hayes Street.
  • Crews completed the sanitary sewer replacement by open trench method in the westbound lanes of Second Street from Ida Street to Fourth Street.
  • Pouring of new sidewalks between East Street and West Street for ADA improvements.
  • Crews formed new curb, gutter, and sidewalk on Second Street between West Street and Marquard Avenue.
  • Crews erected form panels for the retaining wall on Second Street between East Street and Miramar Avenue.
  • Drilling crews drilled soil anchors for retaining wall on Second Street.
  • Crews began applying shotcrete on the new retaining wall on Second Street.

workers repairing retaining wall

NEXT WEEK (September 6 – 9):

  • No work will be performed on Labor Day, September 5, 2022.
  • Continue the installation of fiber optic conduit and cable on Third Street from E Street to D Street.
  • Sanitary sewer rehabilitation: the crews will start installing new sewer pipe and laterals by open trench method on Ida Street.
  • Crews will replace concrete curb ramps and sidewalks on Second Street between West Street and Marquard Avenue.
  • Crews will pave Tamalpais Avenue between Third Street and Fourth Street on Tuesday, September 6th, 2022.
  • Crews will continue applying shotcrete to the new retaining wall.

workers and heavy equipment

IMPACTS:

  • Beginning September 6, 2022, PG&E will begin its electrical relocation project on Second Street from Fourth Street to Miramar Avenue.
  • The stairway from Second Street to Jessup Street (south of Ida Street) is currently closed.
  • For the Lane Shift on Second Street the posted speed limit is 25 mph, drivers should be aware of changed conditions and be alert.
  • Traffic Controls (temporary signs, message boards, traffic cones, delineators and detour signs) will be put in place to direct motorists through the work area.
  • Curb parking spaces will be marked “No Parking.”

For more information, visit the project website or contact the City at thirdstreet@cityofsanrafael.org.

The hours of work will be 6:00am – 6:00pm and lane closures 6:00am – 3:00pm on Third Street and Second Street westbound, and 9:00am – 6:00pm on Second Street eastbound.

Please note: all estimated timelines are tentative and subject to change.

Close window